Release Checklist: vX.Y.Z
This checklist tracks the process for releasing version vX.Y.Z of the OpenFlexure Microscope Server.
Phase 1: Preparation (T-6 Weeks minimum)
This phase focuses on planning the release and, crucially, getting any major infrastructure or build system changes merged before the feature freeze.
- **Prepare: **Create the
Server vX.Y.Z/Server vX.Y.Z-(alpha|beta)Amilestone in GitLab at organisation level, and create an issue with this template. - Define Scope: Tag all intended Issues and feature MRs with it. This is often done in a planning meeting with the core team. Issues and MRs should be tagged in:
- Server repo
- Stitching repo
- OS customiser repo
- OFM CLI tools
- Define upstream versions: Does this release depend on a major dependency change (such as new LabThings version)? If so these must have issues.
- Schedule: Set and announce the Feature Freeze and Release Date. Feature freeze should be at least 2 weeks before the release date.
- Build System: Deadline: All build system MRs must be merged and tested. (This should happen as early as possible in the cycle).
Phase 2: Feature Freeze (T-2 Weeks)
- Announce: Announce the Feature Freeze deadline one week out. This should be announced on the OpenFlexure Forum and in a message/email to the core team.
- Deadline: FEATURE FREEZE. All MRs for the milestone must be merged.
- Branch: Create a
release/vX.Y.Zbranch frommain.- From this point, only bug fixes (regressions) are merged into this branch.
- Communication: Inform the team that all new feature work should target the next milestone.
Phase 3: Testing & Qualification (T-1 Week)
This phase is dedicated to intensive testing and bug fixing on the release/vX.Y.Z branch.
- Create Image: Flash at least one SD card with the new image.
- Create Test Plan: Document the specific tests to be run.
- Execute Test Plan:
- Camera Calibration
- Picamera v2
- Picamera HQ
- Camera Stage Mapping
- v7 Microscope
- Simulation
- Movement
- v7 Microscope
- Simulation
- Autofocus
- v7 Microscope
- Simulation
- Smart Scan + stitching
- v7 Microscope (we probably need a bit of detail here RE slides)
- Simulation
- Recentre and ROM (v7 Microscope only)
- Opening each tab and sub-tab and checking things look as expected
- v7 Microscope
- Simulation
- Manual
- Camera Calibration
- Triage: Triage all bugs found. Fix any release-blocking bugs.
- Repeat: Re-build image and re-test as bugs are fixed. Update release date if absolutely necessary. (Optional)
Phase 4: Release Day (T-0)
- Final Version Bump:
- Server Package: Update version number (add specific files).
- Stitching Package: Update version number (add specific files).
- Commit and merge the final version bumps into the
release/vX.Y.Zbranch.
- Final Build: Generate the final, official release image from the
release/vX.Y.Zbranch. - Draft Notes: Draft the release notes and forum post.
- Merge: Merge the
release/vX.Y.Zbranch intomain. - Tag: Create a new Git tag on
main(e.g.,vX.Y.Z). - Publish:
- Push the tag to GitLab.
- Publish new versions of software sub-packages, such as openflexure-stitching, on PyPi.
- Create a new GitLab Release from the tag.
- Upload the final release image and other artifacts to the GitLab Release.
- Paste the release notes into the GitLab Release description.
Phase 5: Post-Release
- Communicate: Publish the release announcement on the OpenFlexure forum.
- Announce: Share the forum post on other relevant channels (e.g., LinkedIn, Emailing Collaborators).
- Close: Close this issue and the corresponding GitLab Milestone.
- Celebrate!