Release Checklist: vX.Y.Z
This checklist tracks the process for releasing version vX.Y.Z of the OpenFlexure Microscope Server.
Phase 1: Preparation (T-6 Weeks minimum)
This phase focuses on planning the release and, crucially, getting any major infrastructure or build system changes merged before the feature freeze.
- Define Scope: Create the
vX.Y.Zmilestone in GitLab and tag all intended feature MRs with it. Thisn is often done in a planning meeting with the core team. - Schedule: Set and announce the Feature Freeze and Release Date. Feature freeze should be at least 2 weeks before the release date.
- Build System: Identify all required OS-level, build system, or OS customiser changes.
- Build System: Deadline: All build system MRs must be merged and tested. (This should happen as early as possible in the cycle).
Phase 2: Feature Freeze (T-2 Weeks)
- Announce: Announce the Feature Freeze deadline one week out. This should be announced on the OpenFlexure Forum and in a message/email to the core team.
- Deadline: FEATURE FREEZE. All MRs for the milestone must be merged.
- Branch: Create a
release/vX.Y.Zbranch frommain.- From this point, only bug fixes (regressions) are merged into this branch.
- Communication: Inform the team that all new feature work should target the next milestone.
Phase 3: Testing & Qualification (T-1 Week)
This phase is dedicated to intensive testing and bug fixing on the release/vX.Y.Z branch.
- Create Image: Flash at least one SD card with the new image.
- Create Test Plan: Document the specific tests to be run.
- Execute Test Plan:
- HQ Camera Test (Optional)
- High-Resolution Test
- Low-Resolution Test
- ROM Test
- Stitching Tests
- Test final image on all supported hardware revisions.
- Test functionality on the Microscope Simulator.
- Triage: Triage all bugs found. Fix any release-blocking bugs.
- Repeat: Re-build image and re-test as bugs are fixed. Update release date if absolutely necessary. (Optional)
Phase 4: Release Day (T-0)
- Final Version Bump:
- Server Package: Update version number (add specific files).
- Stitching Package: Update version number (add specific files).
- Commit and merge the final version bumps into the
release/vX.Y.Zbranch.
- Final Build: Generate the final, official release image from the
release/vX.Y.Zbranch. - Draft Notes: Draft the release notes and forum post.
- Merge: Merge the
release/vX.Y.Zbranch intomain. - Tag: Create a new Git tag on
main(e.g.,vX.Y.Z). - Publish:
- Push the tag to GitLab.
- Publish new versions of software sub-packages, such as openflexure-stitching, on PyPi.
- Create a new GitLab Release from the tag.
- Upload the final release image and other artifacts to the GitLab Release.
- Paste the release notes into the GitLab Release description.
Phase 5: Post-Release
- Communicate: Publish the release announcement on the OpenFlexure forum.
- Announce: Share the forum post on other relevant channels (e.g., LinkedIn, Emailing Collaborators).
- Close: Close this issue and the corresponding GitLab Milestone.
- Celebrate!