Release Checklist: vX.Y.Z

This checklist tracks the process for releasing version vX.Y.Z of the OpenFlexure Microscope Server.


Branching Strategy (as of v3 development)

The current branching strategy is for alpha and beta development of v3. There is an issue open (#606) to discuss branching beyond v3.

  • The default branch is called v3.
  • Feature branches are made from v3 and merged back into v3.
  • We do not make a new release branch.
  • We still perform a feature freeze before release.
  • We still tag each release and post it on the forum.
  • We do not rename the v3 branch or create additional long-lived branches for releases.

Phase 1: Preparation (T-6 Weeks minimum)

This phase focuses on planning the release and, crucially, getting any major infrastructure or build system changes merged before the feature freeze.

  • **Prepare: **Create the Server vX.Y.Z/Server vX.Y.Z-(alpha|beta)A milestone in GitLab at organisation level, and create an issue with this template.
  • Define Scope: Tag all intended Issues and feature MRs with it. This is often done in a planning meeting with the core team. Issues and MRs should be tagged in:
    • Server repo
    • Stitching repo
    • OS customiser repo
    • OFM CLI tools
  • Define upstream versions: Does this release depend on a major dependency change (such as new LabThings version)? If so these must have issues.
  • Schedule: Set and announce the Feature Freeze and Release Date. Feature freeze should be at least 2 weeks before the release date.
  • Build System: Deadline: All build system MRs must be merged and tested. (This should happen as early as possible in the cycle).

Phase 2: Feature Freeze (T-2 Weeks)

  • Announce: Announce the Feature Freeze deadline one week out. This should be announced on the OpenFlexure Forum and in a message/email to the core team.
  • Deadline: FEATURE FREEZE. All MRs for the milestone must be merged.
  • Branching Note: During alpha and beta development, feature freeze marks the point where only bug fixes and release preparation may be merged into the default branch.
  • Communication: Inform the team that all new feature work should target the next milestone.

Phase 3: Testing & Qualification (T-1 Week)

This phase is dedicated to intensive testing and bug fixing.

  • Create Image: Flash at least one SD card with the new image.
  • Create Test Plan: Document the specific tests to be run.
  • Execute Test Plan:
    • Camera Calibration
      • Picamera v2
      • Picamera HQ
    • Camera Stage Mapping
      • v7 Microscope
      • Simulation
    • Movement
      • v7 Microscope
      • Simulation
    • Autofocus
      • v7 Microscope
      • Simulation
    • Smart Scan + stitching
      • v7 Microscope (we probably need a bit of detail here RE slides)
      • Simulation
    • Recentre and ROM (v7 Microscope only)
    • Opening each tab and sub-tab and checking things look as expected
      • v7 Microscope
      • Simulation
      • Manual
  • Triage: Triage all bugs found. Fix any release-blocking bugs.
  • Repeat: Re-build image and re-test as bugs are fixed. Update release date if absolutely necessary. (Optional)

Phase 4: Release Day (T-0)

  • Final Version Bump:
    • Server Package: Update version number (add specific files).
    • Stitching Package: Update version number (add specific files).
    • Commit and merge the final version bumps into default branch.
  • Final Build: Generate the final, official release image from the default branch.
  • Draft Notes: Draft the release notes and forum post.
  • Tag: Create a new Git tag on the default branch (e.g., vX.Y.Z).
  • Publish:
    • Push the tag to GitLab.
    • Publish new versions of software sub-packages, such as openflexure-stitching, on PyPi.
    • Create a new GitLab Release from the tag.
    • Upload the final release image and other artifacts to the GitLab Release.
    • Paste the release notes into the GitLab Release description.

Phase 5: Post-Release

  • Communicate: Publish the release announcement on the OpenFlexure forum.
  • Announce: Share the forum post on other relevant channels (e.g., LinkedIn, Emailing Collaborators).
  • Close: Close this issue and the corresponding GitLab Milestone.
  • Celebrate!