Rahix
c031fa5a43
Add counter metrics that count the total operating time for the roughing pump and the diffusion pump. |
||
---|---|---|
.. | ||
.gitignore | ||
adc.go | ||
ci.sh | ||
go.mod | ||
go.sum | ||
gpio.go | ||
http.go | ||
index.html | ||
main.go | ||
process.go | ||
process_blocks.go | ||
process_blocks_test.go | ||
process_controller.go | ||
README.md | ||
scientific.go | ||
succd.png | ||
succd.service | ||
succd.svg |
succd
A little daemon for monitoring the SEM. This is a temporary solution that runs on a BeagleBone Enhanced (succbone.lab
) and SHOULD be replaced with a proper PLC/SCADA system and general process control in the future.
Features:
- Monitors the state of the Pirani gauge via the BBE's builtin ADC.
- Allows enabling/disabling the diffusion/roughing pumps (builtin controller always keeps them enabled).
- Allows for simulating vent/pumpdown button presses.
Pins
P9 pin number | Relay number | Relay board / channel number | GPIO number | Function |
---|---|---|---|---|
27 | -KFA1 | 1 / 4 | 115 | Roughing Pump |
23 | -KFA2 | 1 / 3 | 49 | Diffusion Pump |
n/c | -KFA3 (broken) | 1 / 2 | n/c | |
12 | -KFA4 | 1 / 1 | 60 | Vent Button |
15 | -KFA5 | 2 / 4 | 48 | Pump Down Button |
11 | -KFA6 | 2 / 3 | 30 | Rough Vacuum Out |
42 | -KFA7 | 2 / 2 | 7 | High Vacuum Out |
n/c | -KFA8 | 2 / 1 | n/c |
Accessing at the lab
Go to succbone.lab.fa-fo.de.
Known issues
Sometimes the websocket doesn't connect. Refreshing the page a few times should fix it.
Running locally
$ ./ci.sh # run tests
$ go run . -fake
Then point your browser to localhost:8080
Deploying on the succbone
$ ssh root@succbone systemctl stop succd
$ GOARCH=arm go build .
$ scp succd root@succbone:/usr/bin/succd
$ ssh root@succbone systemctl start succd